Welcome: Foshan Glory(Lihongyuan) machinery Equipment co.,ltd   Language:

Film lamination machine for sheet or coil polishing machine

1. Power: 2.2 KW
2.Two roller of film on it 

-_02

 

Basic specification for  Polishing  machine

Film lamination machine 2 pcs Brushing roll  for cleaning
Power2.2 KW
Lifting cylinder: Φ63mm×100mm
FunctionDouble-sided film: air shaft, bay roller, brake system,
Thickness for stainless steel0.3-3 mm( Standard)
Feeding speed0-50 M/min for sheet

 

 Technical Parameter

1.Raw material:

a.Stainless steel sheet : 430,439,445,304,316,200 series

b.Sheet surface:2B and BA surface

c.Sheet width: 200-1600 mm for coil or sheet

d.thickness of sheet:0.3-3mm.

2.Finished product parameters:

   Laminate films on two side of stainless steel sheet or  coil

 

Equipment Description:

1. Laminating roller: Φ130mm×1400mm,
2. Motor: 2.2KW
3. Lifting cylinder: Φ63mm×100mm,
4. Double-sided film: air shaft, bay roller, brake system,

 

 

company.jpg-_09234-_10-_11-_12-_13

Q1: What kind of machine do you have ?

A1: We three type different machine line and accept customize

a. coil to coil wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

b. Sheet to sheet wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

c. Hi precision slitting line for cold roll for different width .

d. Cut to length (Stop shear and frying shear ) for cold roll

e. The strip edge trimming machine for deburring +Chamfering +round edge for different steel strip(from 5mm-300 mm)

Q2: How to visit your company?

Our company located in Foshan city ,Guangdong province of China , we can pick you up from Guangzhou Baiyun international airport or any other place in Guangdong province .

Q3:How long will you send the proposal and offer?

A3:We need you provide your material data and your requirement for  machine,then we can give you offer within 2-3 days.

Q4: What is your payment term and lead time?

A4: We usually accept 30% deposit ( the strip edge trimming machine line need 50%), the balance must be paid before shippment ,or 70% is irrevocable LC at sight ; the lead time : we generally need about 90 days after getting deposit .

Q5: How to install the machine and the engineer  fee,and warranty?

A5: We will send one or two engineer to install the machine in customer plant,the customer need bear the visa fee/flight ticket/accommodation during installation ,and give 80 usd subsidy to engineer; installation and training time : it usually need about 10-25 days with the cooperation  from customer  ,depend on the size of machine .


Inquiry:
Leave a message

Facebook

Twitter

LinkedIn

pinterest

Youtube

instagram

+86-1581598936

whatsapp

info@gmachinery.cn

1309841080

Top