Welcome: Foshan Glory(Lihongyuan) machinery Equipment co.,ltd   Language:

1600 type Sheet to sheet Polishing and grinding Line for No.4+Hairline

A.Equipment consisting :1.Vaccum automatic loading equipment and rack /2.  3 case of 2 pcs   NO.4 heads /3 . one case of 3 hairline heads/4. Clean and drying Unit/ 5.automatic film lamination machine / 6.Vaccum automatic unloading equipment/7.Paper Belt Filter System /8.Electronic control system (PLC Cabinet and 1 pcs Controler table );
B.Staniless steel raw material : Max sheet : 1550*4000/6000 mm, thickness : 0.3-3 mm. Speed:Time for each sheet: 3min 36 's.Speed:20-25 m/min
C.Finishing surfa

PDF

1600 type  Stainless Steel Sheet to sheet Polishing Line for No.4+Hairline 

                  


                         

1600 wet oil  type polishing and grinding machine with automatic loading and unloading machine1600 wet oil  type polishing and grinding machine with automatic loading and unloading machine

 1600 wet oil  type polishing and grinding machine with automatic loading and unloading machine

Basic specification for  Polishing  machine

Polishing nameNo.4 Hairline
Speed of Abrasive belt2000-3000 r/Min0.35m/min
 No. of polishing heads/roll3 grinding heads 3 grinding heads
Power60KW*3+3KW transfer motor0.75 KW*3 Transfer Drive Motor
Abrasive belt length perimeter 2620*1580 mm perimeter 2620*1580 mm
Maximum widht of material1550 mm1550 mm
Thickness for stainless steel0.3-3 mm( Standard)
Feeding speed0-25 M/min
Processing type oil wet type 
Cleaning and drying controlling hot water clean and  fan drying 
Filter system use paper belt filte ,so the water can be recyled


 

 Technical Parameter

1.Raw material:

a.Stainless steel sheet : 430,439,445,304,316,200 series

b.Sheet surface:2B and BA surface

c.Sheet width: 200-1550 mm. max sheet: 1550*4000mm/6000mm

d.thickness of sheet:0.3-3mm.

2.Finished product parameters:

Surface of stainless steel sheet:NO.4 ,Hairline,  No.4+hairline(dependiing grit of abrasive  belt 120#/150#/180#/220#/320# grit)

3.Equipment parameters:

a.Speed:0-25M/min  b.Power: About 255KW C.Operator: 1 technician and 2-3 workers.d.Height of working: 1000 mm. e.Space: W25*D6 M. f.Voltage:380V/ 3phrase/50 HZ(depend on customer requirment). g.Grinding Type:Wet oil type .h.PLC/HMI:Siemens 

4.Equipment component

1..Automatic -Vaccume Lifter-loading (Optional)/2.Conveyor /3.3 case for  No.4 Polishing heads; /3. 1 case of Hairline heads ( each case has 3 heads).4.Clean and drying Unit/ 5.automatic Laminating machine   /6. Platform for inspection / 7.Automatic -Vaccume Lifte for exit (Optional)  /8.Paper filter Filter System.9.Movable Electronic Controller table+Electric cabinet 

 

Direction:From   to   (The operator faces the machine , feeding coil from)

image.png

1600.jpg

 

-_08-_09234-_10-_11-_12-_13

Q1: What kind of machine do you have ?

A1: We three type different machine line and accept customize

a. coil to coil wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

b. Sheet to sheet wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

c. Hi precision slitting line for cold roll for different width .

d. Cut to length (Stop shear and frying shear ) for cold roll

e. The strip edge trimming machine for deburring +Chamfering +round edge for different steel strip(from 5mm-300 mm)

Q2: How to visit your company?

Our company located in Foshan city ,Guangdong province of China , we can pick you up from Guangzhou Baiyun international airport or any other place in Guangdong province .

Q3:How long will you send the proposal and offer?

A3:We need you provide your material data and your requirement for  machine,then we can give you offer within 2-3 days.

Q4: What is your payment term and lead time?

A4: We usually accept 30% deposit ( the strip edge trimming machine line need 50%), the balance must be paid before shippment ,or 70% is irrevocable LC at sight ; the lead time : we generally need about 90 days after getting deposit .

Q5: How to install the machine and the engineer  fee,and warranty?

A5: We will send one or two engineer to install the machine in customer plant,the customer need bear the visa fee/flight ticket/accommodation during installation ,and give 80 usd subsidy to engineer; installation and training time : it usually need about 10-25 days with the cooperation  from customer  ,depend on the size of machine .

Contace person : Mike Chen Mob/Whatsapp:86 15815989367

Inquiry:
Leave a message

Facebook

Twitter

LinkedIn

pinterest

Youtube

instagram

+86-1581598936

whatsapp

info@gmachinery.cn

1309841080

Top