Welcome: Foshan Glory(Lihongyuan) machinery Equipment co.,ltd   Language:

1300 Hi precision Slitting Line

1. Product Name: 1300 type slitting line 
2.Material:ss,carbon steel,galvanized,coled roll
3.ID of Coil:508 MM ,OD:≤1800mm
4.Mini width of strips:10mm
5.Scrap edge width range:2-5mm
6.Burr:≤0.05mm
7.Straightness:Strip width less  30mm:  less 0.8/1M 
8.Operator:1 technician and 2-3 workers
9.Height of working:1000MM
10.After-sales Service Provided:Yes

                                                    


1300*3 Type Hi Precision Slitting Line

slitting line layout.jpg

Technical Parameter

ARaw material Coil

 1. Coil Material:Cold Rolled, Galvanized Steel /HR  2.Thickness:0.3-3.0 mm .3.Max Width:1250mm

4.Outer Diameter :≤φ1600mm   Inner Diameter: 480-508mm  5.Max Coil weight: 15 MT 

6.Raw material mechanical properties:tensile strengthσb780Mpa

BFinished product parameters

1.Strip  Inner Diameter :Φ508mm

 2.Strip  Outer Diameter:≤φ1700mm.

3.Strips max weight:15MT

4.Number of strips:thickness3.0mm15 pcs; 0.5 MM30 pcs; 

5.:Mini width of strips:thickness3.0mm15 pcs; 0.5 MM35 pcs;

6.Mini width of strips:20 mm    7.Scrap edge width range:2-5mm

8.Burr:0.05mm   

9.Straightness:

Strip width ≦ 30mm:  0.8/1M

Width for slitting 30mm:0.8/1M

Width for slitting 30mm:0.5/1M

(excluding the head and tail plates within 10M).


C.Equipment parameters

1. Speed:0-120m/minOne key to start acceleration and deceleration

2.Shear line speed:0-15m/min  3.Power:380V/50Hz/3Ph

4.Total Power:About 350KW.   5.Operator:1 technician and 2-3 workers

6.Height of working:1000MM.  7.Space:(W)23m× (D)8 m

8.Direction:From   to   (The operator faces the machine , feeding coil from)

9.Temperature near machine:0C-40 C

10.Air pressure:0.4-0.6MPa


3).Mechanical composition:

1.Loading car with stock bay                          1 set

2.Decoiler with holding arm                            1 set         

3.Peel table ,Pinch Roll ,Crop shear              1 set         

4.Loop bridge1#                                             1 set

5.Correcting and pressing  device                 1 set

6.Hi precision Slitter                                       1 set        

7.Scrap winder                                               1 set

8.Loop bridge2#                                             1 set

9.Tension table with pinch roll                        1 set

10.Recoiler with separator                             1 set      

11.Unloading Car                                           1 set

12.Supporting arm                                         1 set

13.Hydraulic system                                      1 set

14.Electronic control system                         1 set

1709957916667011.jpg

1709957916972131.jpg

1709957781761842.jpg

1709957781417652.jpg

1709957781857818.jpg

1709957781751834.jpg

1709957781357789.jpg

1709957781757146.jpg

company.jpg-_09234-_10-_11-_12-_13

Q1: What kind of machine do you have ?

A1: We three type different machine line and accept customize

a. coil to coil wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

b. Sheet to sheet wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

c. Hi precision slitting line for cold roll for different width .

d. Cut to length (Stop shear and frying shear ) for cold roll

e. The strip edge trimming machine for deburring +Chamfering +round edge for different steel strip(from 5mm-300 mm)

Q2: How to visit your company?

Our company located in Foshan city ,Guangdong province of China , we can pick you up from Guangzhou Baiyun international airport or any other place in Guangdong province .

Q3:How long will you send the proposal and offer?

A3:We need you provide your material data and your requirement for  machine,then we can give you offer within 2-3 days.

Q4: What is your payment term and lead time?

A4: We usually accept 30% deposit ( the strip edge trimming machine line need 50%), the balance must be paid before shippment ,or 70% is irrevocable LC at sight ; the lead time : we generally need about 90 days after getting deposit .

Q5: How to install the machine and the engineer  fee,and warranty?

A5: We will send one or two engineer to install the machine in customer plant,the customer need bear the visa fee/flight ticket/accommodation during installation ,and give 80 usd subsidy to engineer; installation and training time : it usually need about 10-25 days with the cooperation  from customer  ,depend on the size of machine .


Inquiry:
Leave a message

Facebook

Twitter

LinkedIn

pinterest

Youtube

instagram

+86-1581598936

whatsapp

info@gmachinery.cn

1309841080

Top