Welcome: Foshan Glory(Lihongyuan) machinery Equipment co.,ltd   Language:

1300 wet oil type Coil Polishing Machines line for No.4

Place of Origin:Guangdong, China
Condition	:New
Machinery Test Report:Provided
Marketing Type:	Hot Product 202
Warranty of core components	:1 years
Core Components:	PLC, Bearing, Gearbox, Motor, Gear
Power (kW):	360
Weight (KG):	40000
Key Selling Points:	Long Service Life
Warranty:	1 years
Showroom Location	Turkey, Brazil, Saudi Arabia, Pakistan, India, Russia, Thailand
Brand Name:	Glory
Packaging and delivery
Port	Shenzhen/Nansha
Supply Ability	5 Set/Sets per Month


1300 wet oil type Automatic stainless steel  coil to coil  Polishing and grinding machine line for no.4 -_02

 .jpg


Basic specification for  Polishing  machine

Polishing nameNo.4 
Speed of Abrasive belt2000-3000 r/Min 
 No. of polishing heads/roll3 grinding heads
Power37KW*4+3KW transfer motor
Abrasive belt length perimeter 2620*1280 mm
Maximum widht of material1250 mm
Thickness for stainless steel0.3-2 mm( Standard)
Feeding speed0-30 M/min
Processing type oil wet type 
Cleaning and drying controlling hot water clean and  fan drying 
Filter system use paper belt filte ,so the water can be recyled

Technical Parameter

1.Raw material:

a.Stainless steel coil: 430,439,445,304,316,200 series

b. Coil surface:2B and BA surface

c.Coil  Data: ID:490-508 MM, OD:≤φ1600mmwidth:200-1250 mm. max coil weight:15 MT

d.thickness of sheet:0.3-2 .0 mm.

2.Finished product parameters:

Surface of stainless steel coil:NO.4 . (dependiing grit of abrasive  belt 120#/150#/180# grit)

Coil  Data: ID:508 MM, OD:≤φ1600mmwidth:200-1250 mm. max coil weight:15 MT

3.Equipment parameters:

a.Speed:0-50M/min  b.Power: About 286KW (Decoiler +recoiler are 141KW, Polishing machine is  37*3+25=136KW), c.Operator: 1 technician and 2-3 workers.d.Height of working: 1000 mm. e.Space: W25*D6 M. f.Voltage:380V/ 3phrase/50 HZ(depend on customer requirment). g.Grinding Type:Wet oil type .h.PLC/HMI:Siemens 

4.Equipment component

1..Decoiler +loading car /2.pre tenstion table with crop shear / 3.3 case for  No.4 Polishing heads; /4. Clean and drying Unit/5. Platform for inspection/6. Laminating machine   /7. Tention table with guiding roll  /8. Recoiler +Assistant device for recoiler+EPC  system +unloading car /9.paper decoiler /10.Paper filter Filter System/11.Simens PLC with control table System/12.Hydraulic System

 

Direction:From   to   (The operator faces the machine , feeding coil from)

image.pngimage.png

 2.jpg

 

-_08-_09234-_10-_11-_12-_13

Q1: What kind of machine do you have ?

A1: We three type different machine line and accept customize

a. coil to coil wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

b. Sheet to sheet wet or dry type  polishing and grinding machine for No.4 +Brushing roll+hairline for steel surface

c. Hi precision slitting line for cold roll for different width .

d. Cut to length (Stop shear and frying shear ) for cold roll

e. The strip edge trimming machine for deburring +Chamfering +round edge for different steel strip(from 5mm-300 mm)

Q2: How to visit your company?

Our company located in Foshan city ,Guangdong province of China , we can pick you up from Guangzhou Baiyun international airport or any other place in Guangdong province .

Q3:How long will you send the proposal and offer?

A3:We need you provide your material data and your requirement for  machine,then we can give you offer within 2-3 days.

Q4: What is your payment term and lead time?

A4: We usually accept 30% deposit ( the strip edge trimming machine line need 50%), the balance must be paid before shippment ,or 70% is irrevocable LC at sight ; the lead time : we generally need about 90 days after getting deposit .

Q5: How to install the machine and the engineer  fee,and warranty?

A5: We will send one or two engineer to install the machine in customer plant,the customer need bear the visa fee/flight ticket/accommodation during installation ,and give 80 usd subsidy to engineer; installation and training time : it usually need about 10-25 days with the cooperation  from customer  ,depend on the size of machine .

Contace person : Mike Chen Mob/Whatsapp:86 15815989367


Inquiry:
Leave a message

Facebook

Twitter

LinkedIn

pinterest

Youtube

instagram

+86-1581598936

whatsapp

info@gmachinery.cn

1309841080

Top